
Steps before
Steps

Future Storage
Future Storage

Bare Concrete
Bare Concrete

Walls Started
Walls Started

Around the Sump Pump
Around the Sump Pump

Crown Molding
Crown Molding

Boxing out ducts and Girders
Boxing out ducts and Girders

Ceilings going up 1
Ceilings going up 1

Ceilings going up 2
Ceilings going up 2

Ceilings going up 3
Ceilings going up 3

Circuit Breakers
Circuit Breaker Panel with new Arc Fault breakers to code.

Flooring 1
Flooring 1

Flooring 2
Flooring 2

Around the door
Around the door

Around the Window
Around the Window

Towards the stairs and storage
Towards the stairs and storage

Towards the door with post wrap
Towards the door with post wrap

The Post Wrap
The Post Wrap

The Sump Pump area now
The Sump Pump area now

Work out room towards stairs
Work out room towards stairs